Turnkey Delivery

Advanced Engineered
Cleanroom Systems

Integrated cleanroom solutions for pharmaceutical, electronics, medical device, food processing and precision manufacturing industries.

200+

PROJECTS DELIVERED

15+

YEARS EXPERIENCE

ISO

INDUSTRIES SERVED

Our Expertise

Complete Cleanroom Solutions

As a core part of our industrial engineering portfolio, Shinrai provides end-to-end cleanroom infrastructure. We orchestrate the entire lifecycle — from initial design coordination and precise equipment supply to flawless installation and final commissioning. Partnering with trusted industry specialists, we ensure your facility meets the highest standards of contamination control and process safety.

Equipment & Systems

Solutions We Offer

Precision-engineered equipment manufactured to exacting standards for high-performance contamination control.

manual powder

Modular Cleanrooms

Pre-engineered, scalable cleanroom wall and ceiling panel systems. Rapid installation with…

ISO Class 1 to 9

Flush surfaces

Acoustic insulation

auto powder

Air Showers

High-velocity personnel and material air showers to prevent particulate contamination before…

SS 304/316 construction

Microprocessor control

Interlocking doors

cyclone recovery

Air Handling Units (AHU)

Industrial-grade air handling units designed for precise temperature, humidity, and pressure

Energy efficient

Thermal break profiles

Chilled water / DX

cartridge recovery

Dynamic Pass Boxes

Material transfer equipment to eliminate cross-contamination between areas of different…

UV germicidal lamp

HEPA filtration

Electromagnetic interlock

cartridge recovery

Cleanroom Doors

Hermetically sealed, completely flush door systems built to withstand rigorous industrial…

Drop-down seals

View panels

Push-button automation

cartridge recovery

HEPA Filtration Systems

Terminal and inline high-efficiency particulate air filters ensuring unidirectional, sterile airflow to

99.995% efficiency

Gel seal frames

DOP testing ports

Industries Served

Applications

Our cleanroom systems are deployed across mission-critical environments where contamination control is paramount.

Pharmaceutical

Medical Devices

Electronics

Food Processing

Laboratories

Automotive Components

Precision Engineering

Industries Served

Why Choose Shinrai

Complete Project Coordination

Seamless management from concept to completion.

Custom Engineering

Solutions tailored to your exact floorplan and process.

Trusted Partner Network

Leveraging top-tier manufacturing alliances.

Installation & Commissioning

Rigorous onsite execution by expert teams.

Single Point of Contact

Simplified communication for complex projects.

Quality Assurance

Adherence to stringent global GMP & ISO standards.

After-Sales Support

Dedicated maintenance and spare parts availability.

Methodology

Our Delivery Process

A systematic, phased approach ensuring precision execution from the drawing board to the factory floor.

01

Requirement Discussion

Understanding capacity, layout, and ISO standards.

02

Solution Design

Engineering blueprints and airflow modeling.

03

Equipment Selection

Sourcing premium components via our network.

04

Supply

Logistics and on-time site delivery.

05

Installation

Expert erection of panels, AHUs, and ducting.

06

Testing

DOP testing, particle counting, and validation.

07

Commissioning

Final handover with complete documentation.

Frequently Ask Questions

We design and install cleanrooms ranging from ISO Class 1 to ISO Class 9, complying with international standards. We tailor the specifications based on whether you are manufacturing semiconductors, pharmaceuticals, or medical devices.

Shinrai acts as a turnkey engineering integrator. We design the system and source the highest quality modular panels, AHUs, and components from our trusted network of specialized manufacturing partners to deliver a cohesive, premium solution.

Project timelines vary significantly based on size and complexity. However, utilizing modular panel construction drastically reduces onsite time compared to traditional builds. A typical mid-sized facility can be installed and commissioned in 6 to 12 weeks after design approval and material delivery.

Yes, our air showers are standalone units that can be integrated into existing entryways. They require standard industrial power connections and a level floor. We offer customized dimensions to fit specific architectural constraints.

Absolutely. As part of our commissioning process, especially for pharmaceutical and medical clients, we provide comprehensive documentation packages including Design Qualification (DQ), Installation Qualification (IQ), and Operational Qualification (OQ).

HEPA filters require periodic DOP (Dispersed Oil Particulate) integrity testing to ensure there are no leaks. Pre-filters should be changed regularly to extend the life of the terminal HEPA filters. We offer Annual Maintenance Contracts (AMC) to handle this routinely.

Need a Complete Cleanroom Solution?

Speak with our engineering team to discuss your cleanroom requirements. We provide end-to-end support from concept through commissioning.

Scroll to Top