Turnkey Delivery
Advanced Engineered Cleanroom Systems
Integrated cleanroom solutions for pharmaceutical, electronics, medical device, food processing and precision manufacturing industries.
200+
PROJECTS DELIVERED
15+
YEARS EXPERIENCE
ISO
INDUSTRIES SERVED
Our Expertise
Complete Cleanroom Solutions
As a core part of our industrial engineering portfolio, Shinrai provides end-to-end cleanroom infrastructure. We orchestrate the entire lifecycle — from initial design coordination and precise equipment supply to flawless installation and final commissioning. Partnering with trusted industry specialists, we ensure your facility meets the highest standards of contamination control and process safety.
Equipment & Systems
Solutions We Offer
Precision-engineered equipment manufactured to exacting standards for high-performance contamination control.
Modular Cleanrooms
Pre-engineered, scalable cleanroom wall and ceiling panel systems. Rapid installation with…
ISO Class 1 to 9
Flush surfaces
Acoustic insulation
Air Showers
High-velocity personnel and material air showers to prevent particulate contamination before…
SS 304/316 construction
Microprocessor control
Interlocking doors
Air Handling Units (AHU)
Industrial-grade air handling units designed for precise temperature, humidity, and pressure
Energy efficient
Thermal break profiles
Chilled water / DX
Dynamic Pass Boxes
Material transfer equipment to eliminate cross-contamination between areas of different…
UV germicidal lamp
HEPA filtration
Electromagnetic interlock
Cleanroom Doors
Hermetically sealed, completely flush door systems built to withstand rigorous industrial…
Drop-down seals
View panels
Push-button automation
HEPA Filtration Systems
Terminal and inline high-efficiency particulate air filters ensuring unidirectional, sterile airflow to
99.995% efficiency
Gel seal frames
DOP testing ports
Industries Served
Applications
Our cleanroom systems are deployed across mission-critical environments where contamination control is paramount.
Pharmaceutical
Medical Devices
Electronics
Food Processing
Laboratories
Automotive Components
Precision Engineering
Industries Served
Why Choose Shinrai
Complete Project Coordination
Seamless management from concept to completion.
Custom Engineering
Solutions tailored to your exact floorplan and process.
Trusted Partner Network
Leveraging top-tier manufacturing alliances.
Installation & Commissioning
Rigorous onsite execution by expert teams.
Single Point of Contact
Simplified communication for complex projects.
Quality Assurance
Adherence to stringent global GMP & ISO standards.
After-Sales Support
Dedicated maintenance and spare parts availability.
Methodology
Our Delivery Process
A systematic, phased approach ensuring precision execution from the drawing board to the factory floor.
01
Requirement Discussion
Understanding capacity, layout, and ISO standards.
02
Solution Design
Engineering blueprints and airflow modeling.
03
Equipment Selection
Sourcing premium components via our network.
04
Supply
Logistics and on-time site delivery.
05
Installation
Expert erection of panels, AHUs, and ducting.
06
Testing
DOP testing, particle counting, and validation.
07
Commissioning
Final handover with complete documentation.
Frequently Ask Questions
What classes of cleanrooms do you build?
We design and install cleanrooms ranging from ISO Class 1 to ISO Class 9, complying with international standards. We tailor the specifications based on whether you are manufacturing semiconductors, pharmaceuticals, or medical devices.
Do you manufacture the modular panels in-house?
Shinrai acts as a turnkey engineering integrator. We design the system and source the highest quality modular panels, AHUs, and components from our trusted network of specialized manufacturing partners to deliver a cohesive, premium solution.
How long does a typical cleanroom installation take?
Project timelines vary significantly based on size and complexity. However, utilizing modular panel construction drastically reduces onsite time compared to traditional builds. A typical mid-sized facility can be installed and commissioned in 6 to 12 weeks after design approval and material delivery.
Can an air shower be integrated into an existing facility?
Yes, our air showers are standalone units that can be integrated into existing entryways. They require standard industrial power connections and a level floor. We offer customized dimensions to fit specific architectural constraints.
Do you provide DQ, IQ, OQ validation documentation?
Absolutely. As part of our commissioning process, especially for pharmaceutical and medical clients, we provide comprehensive documentation packages including Design Qualification (DQ), Installation Qualification (IQ), and Operational Qualification (OQ).
What maintenance is required for the HEPA filtration systems?
HEPA filters require periodic DOP (Dispersed Oil Particulate) integrity testing to ensure there are no leaks. Pre-filters should be changed regularly to extend the life of the terminal HEPA filters. We offer Annual Maintenance Contracts (AMC) to handle this routinely.
Need a Complete Cleanroom Solution?
Speak with our engineering team to discuss your cleanroom requirements. We provide end-to-end support from concept through commissioning.